One meter for every system.
- Wireless direct to Job Link® System for electrical documentation
- Low Pass Filter for VFD systems
- Molex test leads for small circuitry
- Test 3-phase with two leads
- Safety rated CAT IV – 600V/CAT III – 1000V
Test HVACR electrical equipment using phase rotation, True RMS, and Inrush features. Plus connect directly with the Job Link® System app to document electrical measurements.
Electrical Testing for HVACR
True RMS readings through the clamp or leads. Inrush current mode to capture starting amps.
Test 3-Phase Power with Only Two Leads
With an alligator test lead (included) connected to L1, you can determine phase rotation with one hand.